Completed in 2021, the David A. Segal Family Aquatic Center is the newest addition to the Jesuit College Preparatory School campus.
The two-story natatorium showcases an eight-lane, 25-yard competition pool, four-lane warm-up pool, and springboards for one-meter diving. Guests can watch from the climate-controlled gallery, equipped with an automated timing and scoring system and a large indoor video display. Additionally, the space includes a set of Men’s and Women’s locker rooms, a lobby, and a concession area.
In partnership with HKS, SCHMIDT & STACY® provided mechanical, electrical, plumbing, fire alarm and fire protection engineering design services for the new complex.
Project Awards
2022 TEXO Distinguished Building Award of Merit
2022 CMAA Project Achievement Award
Project Details
Completed:
2021
Project Type:
New Construction
Project Size:
29,000 SF
Project Cost:
$15M